Let's Work Together

Capital Development offers an exciting opportunity to be part of an innovative effort to transform PHL into a premier global hub. By smartly sourcing and connecting large, small, and diverse businesses to real opportunities, we will achieve our goals, engage the business community and deliver a first-class experience for travelers.

Contracting opportunities will be updated regularly; the tables below are as of June 2023.

 

Professional Services Opportunities 

 

Quarter 3 - 2023

OPPORTUNITY

DESCRIPTION

MORE INFORMATION

On Call Environmental Services

Provide on-call environmental consulting services with an emphasis on PFAS contamination issues including providing soil & groundwater sampling, analysis, certification & remediation on an as needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.

 

On Call Architectural Services

Provide on-call architectural design services on an as needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.

 

On Call Mechanical, Electrical & Plumbing Engineering Services

Provide comprehensive professional Mechanical, Electrical and Plumbing Engineering design and consulting services on an as needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.

 

Quarter 4 - 2023

OPPORTUNITY

DESCRIPTION

MORE INFORMATION

On Call Project/Construction Management Services

Provide on-call project and construction management engineering and consulting services on an as-needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.

 

On Call Civil Engineering Services

Provide on-call civil engineering services on an as needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.

 

On Call Security & Special Systems Services

Provide on-call engineering and consulting services for projects related to the airport security & special systems on an as needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.

 

 

Public Works Opportunities 

 

Quarter 3 - 2023

OPPORTUNITY

DESCRIPTION MORE INFORMATION

Sacrificial Slabs

The PHL Supervisory Control And Data Acquisition (SCADA) project will replace the existing components of the existing SCADA network by connecting 40 medium voltage substations in the airport terminal complex.  When complete, the functioning SCADA system will allow DOA maintenance personnel to monitor the actions and operations of the substations without visiting the substations physically.  Scope includes an independent fiber optic network, replacement of digital meters, new layer II  data switches, dedicated system servers, and remote desktop nodes of the system to view the data and performance of the substations.

 

Terminal A East HVAC Distribution (Phase 2)

Replacement of nineteen (19) Air Handling Units and associated gas piping in Terminal A East.

 

Mechanical Room 11 & BC Baggage Claim

Replacement of rooftop air handling units (RTUs) and damaged piping in B-C Baggage Claim area. Upgrades to equipment in Mechanical Room #11.

 

Carpentry Shop HVAC

Replacement of existing makeup air unit, condensing unit, split unit condensing units, and associated components. Installation of Bipolar Ionization, connection to the Building automation system, and electrical system upgrades as needed.

 

SCADA

Replacement of existing components of the SCADA network at PHL. Connect 40 medium voltage substations in the airport terminal complex. Enables remote monitoring of substation actions and operations by DOA maintenance personnel. Scope includes independent fiber optic network, replacement of digital meters, new data switches, dedicated system servers, and remote desktop nodes.

 

Fort Mifflin Tunnel Rehabilitation

Improvements to the Fort Mifflin Tunnel, including electrical, mechanical, ventilation, and fire/life safety systems.

 

Engineered Material Arresting System

Installation of Runway 8-26 Engineered Material Arresting System (EMAS) to improve runway safety areas at the eastern end of the runway.

 

Terminal D Bridges and Ticketing Roof and HVAC Roof Top Unit Replacement

Replacement of 170,000 square feet of roofing and HVAC rooftop units at Terminal D.

 

 

Quarter 4 - 2023

 

OPPORTUNITY

DESCRIPTION MORE INFORMATION

Concourse Sewage Line Upgrades

Upgrade to older portions of the concourse sewage line system, both external and internal to the terminal complex. Includes portions of concrete encased terra cotta mains.

 

CCTV Upgrades (Phase 2B)

Continued upgrades to the existing CCTV system, transitioning to 100% IP. Increase CCTV viewing coverage, upgrade video management system (VMS), and improve control rooms/MDFs. Includes replacement of network infrastructure, fiber, equipment, storage, duct bank/concrete encased conduit, and switches to support the new configuration.

 

Taxiway Charlie

Milling and replacing 4 to 7 inches of asphalt on Taxiway Charlie. Grade adjustments may result in varying depths. Deeper rehabilitation sections may be required for areas with extensive damage. Includes installation of electrical components and pavement markings.

 

A East/B Apron Rehabilitation

Project involves rehabilitation and targeted concrete slab replacement for the A-East/B Apron. 

 

PNE Administration Building

Improvements to the existing administrative building, including the installation of an ADA accessible entrance and restrooms, as well as a geothermal air conditioning system.

 

A East HVAC Upgrades (Phase 3)

Replacement of sixteen (16) Air Handling Units in Concourse A East and associated gas piping.

 

Mechanical Room 3BC & 4BC Rehabilitation

Includes replacement of air handlers inside the MR#3BC and MR#4BC including associated hot water and chiller water piping and pumps and upgrades to electrical system as needed to all units.

 

 

Notice of Privacy Practices